Summer projects at area schools
BRES: Routine maintenance and cleaning; Fuel tanks/elevators/boilers/fire systems inspected; Preventative maintenance to all roof areas; Ten outside entry doors and frames replaced; Basketball hoist replaced
BRHS: Routine maintenance and cleaning; Fuel tanks/elevators/boilers/fire systems inspected; Preventative maintenance to all roof areas; Two main backboards to be replaced; Large awning roof (south side) replaced; Auditorium seating, carpet and curtain replacement planned
Fields/grounds: Repaired dugouts on Perkins Field; Grassed in the infield area of Perkins Field
Superintendent’s Office, Edgecomb Eddy School, Southport Central School and Georgetown Central School: Routine maintenance and cleaning
Fire inspections all schools: Fire inspections for all sprinkler systems; exit signs; emergency lights; kitchen fire protection system; fire extinguishers; fire alarm panels; pull stations; smoke detectors; audio/visual strobes.
Event Date
Address
United States