AOS 98 summer projects

Tue, 08/21/2018 - 9:00am

    BRES: Routine maintenance and cleaning; annual inspections of fuel tanks, elevators, asbestos, boilers and fire systems; fire panel devices updated, per code.

    BRHS: Routine maintenance and cleaning; annual inspections of fuel tanks, elevators, asbestos, boilers and fire systems; roof replaced over the original high school.

    Fields and grounds: Railings and posts replaced by Richard Hallinan Construction on the Observation Tower; routine field maintenance, assisted by Smith Climo, Lauren Webster and Donna Jordan

    Superintendent’s Office, Edgecomb Eddy School and Southport Central School: Routine maintenance and cleaning

    Fire inspections all schools: Fire inspections for all sprinkler systems; exit signs; emergency lights; kitchen fire protection system; fire extinguishers; fire alarm panels; pull stations; smoke detectors; and audio/visual strobes.